Re: Copper Canyon Road South Reconstruction

Postby Uther » Thu Apr 26, 2012 11:37 am

Well, it's still a lot less than my pet peeve, the FM 407/I 35E interchange. :)
I finally found an avatar that works!
User avatar
Uther
King of the Block
 
Posts: 2228
Joined: Wed Jul 29, 2009 7:00 pm

Re: Copper Canyon Road South Reconstruction

Postby admin » Mon May 21, 2012 3:25 pm

From Denton County Commissioner Andy Eads:

Update for Copper Canyon Road Construction

This week:
• The contractor will continue grading ditches and driveways
• JL Steel will continue trying steel for the concrete roadway
• Verizon, Crosstex and Bartonville will continue relocating their utilities in Phase II

Last week:
• The contractor graded ditches and driveways
• JL Steel will delivered steel and began tying it
• Finished up undercutting, embanking and the cement treating of Phase I
• Verizon, Crosstex and Bartonville began relocating their utilities in Phase II

REMEMBER it is very dangerous to move or drive around traffic control devices/barricades. It can cause significant damage to your vehicle as well as damaging the integrity of the roadway, causing some construction items to be re-installed. Doing so is also illegal “avoiding traffic control device” and a person can be fined.
CrossTimbersGazette.com Admin
User avatar
admin
Site Admin
 
Posts: 9085
Joined: Fri Sep 09, 2005 10:29 pm
Location: Lantana

Re: Copper Canyon Road South Reconstruction

Postby skiing1974 » Mon May 21, 2012 5:54 pm

thanks for the update admin, but does anyone care what they do on a week to week basis, rather care only for when the road will be done, especially when they are already 6 weeks behind?
User avatar
skiing1974
King of the Block
 
Posts: 2295
Joined: Sat Apr 29, 2006 11:21 am

Re: Copper Canyon Road South Reconstruction

Postby Pipeline » Mon May 21, 2012 6:07 pm

skiing1974 wrote:thanks for the update admin, but does anyone care what they do on a week to week basis, rather care only for when the road will be done, especially when they are already 6 weeks behind?


Excellent point. Low bidder fails and will get nothing but accolades and many praises from the mayor, once completed. I more blame CC's half arssed engineers, that can't spell engineer with 2 e's much less, design and schedule road construction for a company that should be thrown under the bus for contractual ineptitude. Mark my words, in an up coming CTG Mayoral diatribe, coming to a doorstep near you, this company will get Many Kudos, from the CC mayor. CC ain't paying for the work. Denton County taxpayers are. Which means YOU.
"keep your powder dry people, Stormtroopers are coming, get ready"
Pipeline
King of the Block
 
Posts: 2234
Joined: Tue Feb 27, 2007 7:47 pm

Re: Copper Canyon Road South Reconstruction

Postby admin » Sun Jun 03, 2012 11:11 pm

This photo was snapped today (6/3/12) by Lonnie Ward in front of the Denton County Sports Association:
Attachments
CC_Rd_South_6-3-12.jpg
CC_Rd_South_6-3-12.jpg (561.49 KiB) Viewed 1348 times
CrossTimbersGazette.com Admin
User avatar
admin
Site Admin
 
Posts: 9085
Joined: Fri Sep 09, 2005 10:29 pm
Location: Lantana

Re: Copper Canyon Road South Reconstruction

Postby JKTex » Mon Jun 04, 2012 10:10 am

I know he's happy to see concrete finally! :D
"We must reject the idea that every time a law's broken, society is guilty rather than the lawbreaker. It is time to restore the American precept that each individual is accountable for his actions." - Ronald Reagan
JKTex
King of the Block
 
Posts: 3710
Joined: Sat Jun 13, 2009 3:45 pm
Location: Flower Mound

Re: Copper Canyon Road South Reconstruction

Postby Greybeard » Wed Jun 13, 2012 11:58 am

Foreman Willie said this morning that after the crews left yesterday, someone blew barricade near fresh pour down by 407. Drove on top of the uncured concrete until it bogged 'em up a bit, got out and left a few footprints, then got back in vehicle and turned around.
Greybeard
New Neighbor
 
Posts: 18
Joined: Mon Mar 12, 2007 10:22 pm
Location: 409 Copper Canyon Road

Re: Copper Canyon Road South Reconstruction

Postby CopperCanyonResident » Fri Jun 15, 2012 8:32 pm

Greybeard wrote:Foreman Willie said this morning that after the crews left yesterday, someone blew barricade near fresh pour down by 407. Drove on top of the uncured concrete until it bogged 'em up a bit, got out and left a few footprints, then got back in vehicle and turned around.


Thanks Grey Beard.

What is with these idiots! Why not just cut your own throat. What a horrendous waste.
"The budget should be balanced, the Treasury should be refilled, public debt should be reduced, the arrogance of officialdom should be tempered and controlled, and the assistance to foreign lands should be curtailed lest Rome become bankrupt. People must again learn to work, instead of living on public assistance." -Marcus Tullius Cicero
User avatar
CopperCanyonResident
Old Timer
 
Posts: 614
Joined: Wed Apr 27, 2011 5:07 am

Re: Copper Canyon Road South Reconstruction

Postby skiing1974 » Mon Jun 18, 2012 11:05 am

saw 1 pickups and 1 car (definitely didn't look like workers) on saturday morning, coming onto 407 through/aroung the baricades.
User avatar
skiing1974
King of the Block
 
Posts: 2295
Joined: Sat Apr 29, 2006 11:21 am

Re: Copper Canyon Road South Reconstruction

Postby admin » Wed Jun 20, 2012 3:27 pm

Phase One should be finished and open by this Monday afternoon (6/25).
CrossTimbersGazette.com Admin
User avatar
admin
Site Admin
 
Posts: 9085
Joined: Fri Sep 09, 2005 10:29 pm
Location: Lantana

Re: Copper Canyon Road South Reconstruction

Postby skiing1974 » Wed Jun 20, 2012 4:10 pm

so the way I read these phases, phase 2 will shut the road down from where it will be finished now (still south of new connection to Copper Canyon from the new-Kendall neighborhood), to the north of that entry point from Kendall? If so, we still won't be able to access 407 from the end of Golf Club Drive, as we won't be able to go south after we exit Kendall?
User avatar
skiing1974
King of the Block
 
Posts: 2295
Joined: Sat Apr 29, 2006 11:21 am

Re: Copper Canyon Road South Reconstruction

Postby admin » Fri Jun 22, 2012 2:54 am

Construction will be complete on Phase 1 of Copper Canyon Road on Monday: http://www.crosstimbersgazette.com/loca ... onday.html
CrossTimbersGazette.com Admin
User avatar
admin
Site Admin
 
Posts: 9085
Joined: Fri Sep 09, 2005 10:29 pm
Location: Lantana

Re: Copper Canyon Road South Reconstruction

Postby Pipeline » Fri Jun 22, 2012 3:14 pm

admin wrote:Construction will be complete on Phase 1 of Copper Canyon Road on Monday: http://www.crosstimbersgazette.com/loca ... onday.html


With the impending widening of 407 and the completion of FM2499, repairing cc road is a waste of county taxpayer dollars. this should have been done on CC's nickel. I don't use it and I don't need it.
"keep your powder dry people, Stormtroopers are coming, get ready"
Pipeline
King of the Block
 
Posts: 2234
Joined: Tue Feb 27, 2007 7:47 pm